American Water Heater UP300 Specifications

Browse online or download Specifications for Water heaters & boilers American Water Heater UP300. American Water Heater UP300 Specifications [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Follow This Easy Process:
1
Eligibilit
y
2
Submit an Incentive Application
3
Installation
4
Project Completion (Final Applications)
5
Receive your Check
The incentive check will be mailed out six to ei
g
ht weeks after recei
p
t of a com
p
lete final a
pp
lication.
For all calculations to work you must have the Analysis Toolpaks turned on You can turn them
Once your project is completed, e-mail, mail or fax a signed and completed copy of the application and all
required documentation including installed equipment specifications, itemized invoices and, for custom
projects, final calculation of energy savings. Calculate your total incentives per measure using the
attached forms.
If you are viewing this document in Microsoft Excel, please note that each section of the application is
accessible through the tabs at the bottom of the Excel window.
BUSINESS SOLUTIONS
2011 PROGRAM APPLICATION
Check your eligibility. Qualified measures must be installed at facilities served by Consumers Energy. The
facility must have a commercial rate code. Projects must result in an improvement in energy efficiency.
Equipment must meet the specifications as explained in the application.
E-mail, mail or fax a completed copy of the application, including the Application Summary, Customer
Information, and Incentive sheets. Pre-notification applications are strongly encouraged for all
projects and are required for specific measures as well as all custom projects. Please include all
re
q
uired documentation includin
g
e
q
ui
p
ment model number and manufacturer s
p
ecification sheets.
Once you receive your reservation, install the eligible measures on your project and collect all required
documentation for submittal.
Send applications to:
Page 1 Rev. Mar 30, 2011
ConsumersEner[email protected]
Mail
Okemos, MI 48805
1-877-607-0738
If you need assistance, please contact our program hotline:
Consumers Energy Business Solutions
www.consumersenergy.com
P.O. Box 1040
Fax
Please visit our website:
1-877-607-0737
E-mail
F
or a
ll
ca
l
cu
l
a
ti
ons
t
o wor
k
you mus
t
h
ave
th
e
A
na
l
ys
i
s
T
oo
l
pa
k
s
t
urne
d
on.
Y
ou can
t
urn
th
em
on under the Tools/Ad-ins/ menu.
Page view 0
1 2 3 4 5 6 ... 26 27

Summary of Contents

Page 1 - Send applications to:

Follow This Easy Process:1Eligibility2Submit an Incentive Application3Installation4Project Completion (Final Applications)5Receive your CheckThe incen

Page 2 - 2011 PROGRAM GUIDELINES

EERSEER orIPLVHSPF or COPUnit Size (tons) (A)Quantity(B)Incentive Per Ton (C)Incentive(A*B*C) Size CategoryIncentive per Incremental Efficiency Unit (

Page 3 - APPLICATION INSTRUCTIONS

Unit $0.00Unit $0.00Unit $0.00Motor $0.00Motor $0.00Motor $0.00Unit $0.00Door $0.00Door $0.00Unit $0.00Door $0.00Linear foot $0.00per PC controlled $0

Page 4 - APPLICATION CHECKLIST

Incentive Unit # of Units$1.00 kBtu/H$2.00 kBtu/H$0.25 kBtu/H$1,250.00 Unit$400.00 Unit$350.00 Unit$1.75 kBtu/H$0.40 Square foot$0.27 Square foot$8.00

Page 5 - Program Contact:

Forced Air Gas Furnace or Rooftop Unit (RTU) Tune-up SpecificationSpace Heating Boiler Tune-upProcess Boiler Tune-upTune-up Documentation (Submit one

Page 6 - CONTRACTOR INFORMATION

Please attach supporting documentation as described in the Policies and Procedures Manual.Electricity($/kWh)Gas($/MCF)$/kWh Subtotal$/MCF$/kWh Subtota

Page 7 - Rev. Mar 30, 2011

All lighting projects are expected to comply with the Illuminating Engineering Society of North America (IESNA) recommended lighting levels or the loc

Page 8 - OPTIONAL

Table 1: High Performance T8 SpecificationsLamps High BF ≥ 1.011NA2 > 1.553 ≥ 1.044 ≥ 0.771NA2 ≥ 1.513 ≥ 1.004 ≥ 0.75* For lamp with color temperat

Page 9 - # of UnitsUnit

Switching Controls for Multilevel LightingThis measure should be used with daylight or occupancy sensors and is applicable to spaces that require vari

Page 10 - HVAC INCENTIVES

2011 HVAC (ELECTRIC) SPECIFICATIONSUnitary (i.e. RTU) and Split Air Conditioning Systems and Air Source Heat PumpsNew unitary air conditioning units o

Page 11 - MISCELLANEOUS INCENTIVES

HVAC Energy Management System Specification (Pre-notification required)Centrifugal300 - 599 tonsCapacity Range (BTU/H)IPLVTable 2: Water Cooled Qualif

Page 12 - 2011 GAS INCENTIVES WORKSHEET

The program offers business customers both prescriptive incentives for common energy efficiency measures and custom incentives for other eligible ener

Page 13 - Total Tune-up Incentives:

Energy Efficient Ice MakersThe incentive covers ice machines that generate ice cubes, flaked, crushed, or fragmented ice that is 60 grams (2 oz) or le

Page 14 - Pre-notification is required

Table 1: Qualifying SCFM ratings Barrel Wraps for Injection Molders and ExtrudersInsulated blankets strapped around barrels of extruders or injection

Page 15 - 2011 LIGHTING SPECIFICATIONS

2011 NATURAL GAS (HVAC) SPECIFICATIONSIncentive Level Minimum EfficiencyThe incentive is available only for retrofit projects using natural gas as the

Page 16

HVAC Energy Management System Specification (Pre-notification required)HVAC EMS systems must be new and include (a) central time control, (b) real-tim

Page 17

Steam Trap Survey and Repair/ReplacementThe customer may apply for the survey incentive, the repair incentive, or both. The survey incentive is availa

Page 18

Pool Covers The pool size must be between 400 square feet to 4,000 square feet to qualify for the incentive. Equipment must be new.Cover must be a m

Page 19

Attic Roof Insulation (Pre-notification required)This rebate is available to industrial end-use customers who utilize boilers as an integral part of a

Page 20

Project payback equals the ratio of the project cost divided by the annual energy bill savings.2011 CUSTOM SPECIFICATIONSProjects involving measures c

Page 21

2. Installation of equipment3. Submit the Final Application & required documentationAPPLICATION INSTRUCTIONSImportant: Please follow the steps be

Page 22

Prescriptive MeasuresCustom MeasuresApplication Summary (page 5) Application Summary (page 5) Customer Information (page 6) Customer Information (pa

Page 23

Required Attachments Required AttachmentsIncentives WorksheetsIncentives WorksheetsApplication Date:Is this a revised application? Project # (if revis

Page 24

PRIMARY BUSINESS TYPE(select one)TAX STATUS(as entered on W9)(describe other)Natural gas providerElectricity providerProject TypeNAME OF APPLICANT&apo

Page 25

•••••••• • For certain measures, the incentive amount will be determined based on the estimated energy savings. TheApplicant may be required to provid

Page 26

INCENTIVES REQUESTEDCHECKS WILL BE MADE OUT TO NAME OF APPLICANT'S BUSINESS UNLESS PAYMENT IS RELEASED AS BELOWTOTAL PROJECT COST TOTAL INCENTIVE

Page 27 - 2011 CUSTOM SPECIFICATIONS

CFL - Screw In (30 watts or less) $0.00CFL - Screw In (31 watts to 115 watts) $0.00CFL - Dimmable or 3-way $0.00Compact Fluorescent Fixture $0.00LED I

Comments to this Manuals

No comments