Attic Roof Insulation (Pre-notification required)
This rebate is available to industrial end-use customers who utilize boilers as an integral part of a manufacturing process.
Boilers must meet a minimum combustion
efficiency of 82 percent as installed. Only process boilers (i.e., units not primarily
used for domestic hot water, space conditioning, pool or spa use) qualify. The manufacturer name and equipment model
number must be provided. A flue gas analysis measured under full load conditions is required to document combustion
efficiency after installation is complete.
Flat Roof Insulation (Pre-notification required)
This incentive is for adding insulation to existing buildings. Total roof area must be less than 150,000 ft
2.
Roof insulation
must be installed in a space that requires natural gas fired space heating. All materials must be new and meet applicable
state and local codes and must be installed in accordance with the manufacturer’s requirements. "Insulation Entirely above
Deck” and “Metal Building" (as defined by ASHRAE 90.1 2007) roof insulation is eligible for the incentive only when it is
installed between the conditioned and unconditioned areas. Insulation installed above dropped commercial ceilings is not
eligible. Pre-retrofit insulation levels must be less than R-11 and final insulation assembly level must exceed R-24 and/or
local building codes. Pre-Applications will require the following: a) a scaled floor plan of the facility’s total roof area (ft
2
) being
insulated, b) a roof construction detail (sketch) showing a section cut of the existing roof, c) roof construction detail (sketch)
showing a section cut of the proposed roof, and d) specifications of the proposed roof insulation. Pre-construction pictures
of the condition of the existing roof insulation would also be beneficial. The maximum incentive available for this measure is
$20,000 per facility as defined in the policies and procedures manual. Buildings with a roof area larger than 150,000 ft
2
are
eligible for a custom incentive.
This incentive is for adding insulation to existing buildings. Roof insulation must be installed in a space that requires natural
gas fired space heating. All materials must be new and meet applicable state and local codes and must be installed in
accordance with the manufacturer’s requirements. "Attic and Other" (as defined by ASHRAE 90.1 2007) roof insulation is
eligible for the incentive only when it is installed between the conditioned and unconditioned areas. Insulation installed above
dropped commercial ceilings is not eligible. Pre-retrofit insulation levels must be less than R-11 and final insulation
assembly level must exceed R-42 and/or local building codes. Pre-Applications will require the following: a) a scaled floor
plan of the facility’s total roof area (ft
2
) being insulated, b) a roof construction detail (sketch) showing a section cut of the
existing roof c) roof construction detail (sketch) showing a section cut of the proposed roof and d) specifications of the
High Efficiency Process Boile
r
Page 26
Rev. Mar 30, 2011
This incentive applies towards the replacement of an existing conveyor-based gas broiler. New construction projects do not
qualify for a rebate with this measure. Existing broiler must be removed and disposed of in accordance with local and state
codes.
Wall insulation must be installed in a space that has natural gas fired space heating. All installed materials must be new and
meet or exceed all applicable local, state, and federal standards. To qualify existing walls cannot be insulated. The final
insulation levels should exceed R-13 and/or local code for the building type. Incentives will be paid on total square footage
of wall insulation.
A conveyor oven can be described as a heated chamber with a moving belt that carries food product into and through the
chamber. The commercial oven(s) must meet or exceed baking energy efficiency of 42 percent. Ovens with a conveyor
width up to 25” in length must have an idle energy rate of less than or equal to 29,000 BTU/H. Ovens with a conveyor width
over 25” in length must have an idle energy rate of less than or equal to 57,000 BTU/H. Multiple-deck oven configurations
are paid per qualifying oven deck. Used or rebuilt equipment does not qualify.
Wall Insulation (Pre-notification required)
Flexible Batch Broilers
Commercial Conveyor Ovens
e
x
isting
roof
,
c)
roof
constr
u
ction
detail
(sketch)
sho
w
ing
a
section
c
u
t
of
the
proposed
roof
,
and
d)
specifications
of
the
proposed roof insulation. Pre-construction pictures of the condition of the existing roof insulation would also be beneficial.
The maximum incentive available for this measure is $15,000 per facility as defined in the policies and procedures manual.